Condo Common Area Construction
Expert renovation and construction of condo amenities, lobbies, pool decks, fitness centers, and common spaces. SB4-D compliant project delivery for Tampa Bay HOAs and property managers.
Common Area Construction Types
We construct and renovate all types of condo common areas to enhance property value and resident satisfaction.
Lobby & Reception
First impressions and property value driver
- Reception desk and seating
- Mail room and package lockers
- Elevator lobbies
- Concierge station
- Security desk
High-traffic flooring, ADA compliance, lighting design, security integration
Pool Deck & Amenities
Outdoor living and social spaces
- Pool resurfacing/replacement
- Deck pavers or coating
- Cabanas and shade structures
- Outdoor kitchen/grill
- Restroom facilities
Waterproofing, drainage, slip resistance, wind load for structures
Fitness Center
Health and wellness amenities
- Flooring (rubber/vinyl)
- HVAC upgrades for ventilation
- Electrical for equipment
- Mirrors and finishes
- Locker rooms
Floor load capacity, sound isolation, equipment power needs, ventilation
Parking Structure
Vehicle storage and access
- Surface restoration
- Waterproofing membrane
- LED lighting upgrade
- EV charging stations
- Access control systems
Traffic flow during work, structural assessment, coating cure times
Corridors & Hallways
Connecting spaces and fire egress
- Flooring replacement
- Wall finishes and paint
- Lighting upgrades
- Fire safety systems
- Wayfinding signage
Resident access during work, fire code compliance, phased completion
Clubhouse & Social
Community gathering spaces
- Meeting rooms
- Party/event space
- Kitchen facilities
- AV systems
- Storage areas
Acoustics, flexible layouts, commercial kitchen codes if applicable
HOA Construction Process
Structured approach designed specifically for condominium association governance.
Assessment & Planning
4-8 weeksActivities
- Board consultation and needs assessment
- Reserve study review and funding analysis
- Architectural design development
- Engineering studies if structural work required
- Permit requirements identification
HOA Board Role
Define scope and priorities, approve budget parameters
Design & Bidding
6-12 weeksActivities
- Complete construction documents
- Contractor prequalification
- Competitive bidding process
- Bid analysis and recommendation
- Contract negotiation
HOA Board Role
Review designs, approve contractor selection, execute contracts
Pre-Construction
2-4 weeksActivities
- Permit applications and approvals
- Resident communication plan
- Temporary access arrangements
- Material procurement
- Schedule finalization
HOA Board Role
Communicate with residents, approve final schedule
Construction
Varies by scopeActivities
- Demolition and preparation
- Rough construction
- Finish work
- Systems installation
- Quality inspections
HOA Board Role
Weekly progress meetings, change order approvals
Closeout
2-4 weeksActivities
- Punch list completion
- Final inspections
- System training
- Warranty documentation
- Reserve study update
HOA Board Role
Final walkthrough, payment approval, warranty receipt
Project Funding Options
Understanding your options for financing common area improvements.
Reserve Funds
Accumulated reserves designated for capital improvements
- + No interest costs
- + Already planned for
- + No unit owner approval needed
- - May deplete reserves
- - Limited to available balance
- - Impacts other projects
Planned improvements within reserve study scope
Special Assessment
One-time charge to unit owners for specific project
- + Funds large projects
- + Spreads cost across owners
- + Preserves reserves
- - Requires owner approval
- - Payment collection challenges
- - Owner resistance
Major improvements not fully funded by reserves
Association Loan
Bank financing repaid through assessments over time
- + Immediate funding
- + Spreads payments over years
- + Preserves reserves
- - Interest costs
- - Long-term obligation
- - Requires board approval
Large projects with steady assessment capacity
Phased Construction
Breaking project into stages funded over time
- + Smaller funding needs
- + Can adjust based on results
- + Maintains cash flow
- - Extended timeline
- - Potential cost increases
- - Ongoing disruption
Budget-constrained associations with multiple needs
Florida SB4-D Compliance Considerations
How Florida's condo safety legislation affects common area construction planning.
Milestone Inspections
Buildings 3+ stories must complete structural inspections at 30 years (25 if within 3 miles of coast), then every 10 years
Common area work may trigger inspection requirements; coordinate with SIRS compliance
SIRS Compliance
Structural Integrity Reserve Studies required for buildings 3+ stories
Reserve funding for structural components must be maintained; cannot waive reserves
Balcony/Walkway Assessment
Load-bearing elements of balconies and walkways must be inspected
Common area walkway and corridor work should address any structural deficiencies
Reserve Funding
Full funding of reserves for structural components now required
Budget for common area improvements must account for required reserve contributions
Our Common Area Services
Lobby Renovation
Complete lobby transformations including reception, mail rooms, and elevator lobbies.
Pool & Deck
Pool renovations, deck resurfacing, cabanas, and outdoor living spaces.
Fitness Centers
Complete fitness facility buildouts with proper ventilation and equipment infrastructure.
Parking & Garage
Parking structure repairs, waterproofing, lighting, and EV charging installation.
Frequently Asked Questions
Planning a Common Area Improvement?
FCS partners with HOA boards and property managers throughout Tampa Bay to deliver successful common area construction projects. From planning through completion, we guide your association every step of the way.