Construction services in Tampa Bay
Back to Multi-Family Construction

Condo Common Area Construction

Expert renovation and construction of condo amenities, lobbies, pool decks, fitness centers, and common spaces. SB4-D compliant project delivery for Tampa Bay HOAs and property managers.

Common Area Construction Types

We construct and renovate all types of condo common areas to enhance property value and resident satisfaction.

Lobby & Reception

First impressions and property value driver

Components
  • Reception desk and seating
  • Mail room and package lockers
  • Elevator lobbies
  • Concierge station
  • Security desk
Key Considerations

High-traffic flooring, ADA compliance, lighting design, security integration

$150-400/sq ft

Pool Deck & Amenities

Outdoor living and social spaces

Components
  • Pool resurfacing/replacement
  • Deck pavers or coating
  • Cabanas and shade structures
  • Outdoor kitchen/grill
  • Restroom facilities
Key Considerations

Waterproofing, drainage, slip resistance, wind load for structures

$100-300/sq ft

Fitness Center

Health and wellness amenities

Components
  • Flooring (rubber/vinyl)
  • HVAC upgrades for ventilation
  • Electrical for equipment
  • Mirrors and finishes
  • Locker rooms
Key Considerations

Floor load capacity, sound isolation, equipment power needs, ventilation

$75-200/sq ft

Parking Structure

Vehicle storage and access

Components
  • Surface restoration
  • Waterproofing membrane
  • LED lighting upgrade
  • EV charging stations
  • Access control systems
Key Considerations

Traffic flow during work, structural assessment, coating cure times

$5-25/sq ft surface; $50-100k per EV station

Corridors & Hallways

Connecting spaces and fire egress

Components
  • Flooring replacement
  • Wall finishes and paint
  • Lighting upgrades
  • Fire safety systems
  • Wayfinding signage
Key Considerations

Resident access during work, fire code compliance, phased completion

$50-150/sq ft

Clubhouse & Social

Community gathering spaces

Components
  • Meeting rooms
  • Party/event space
  • Kitchen facilities
  • AV systems
  • Storage areas
Key Considerations

Acoustics, flexible layouts, commercial kitchen codes if applicable

$100-250/sq ft

HOA Construction Process

Structured approach designed specifically for condominium association governance.

1

Assessment & Planning

4-8 weeks

Activities

  • Board consultation and needs assessment
  • Reserve study review and funding analysis
  • Architectural design development
  • Engineering studies if structural work required
  • Permit requirements identification

HOA Board Role

Define scope and priorities, approve budget parameters

2

Design & Bidding

6-12 weeks

Activities

  • Complete construction documents
  • Contractor prequalification
  • Competitive bidding process
  • Bid analysis and recommendation
  • Contract negotiation

HOA Board Role

Review designs, approve contractor selection, execute contracts

3

Pre-Construction

2-4 weeks

Activities

  • Permit applications and approvals
  • Resident communication plan
  • Temporary access arrangements
  • Material procurement
  • Schedule finalization

HOA Board Role

Communicate with residents, approve final schedule

4

Construction

Varies by scope

Activities

  • Demolition and preparation
  • Rough construction
  • Finish work
  • Systems installation
  • Quality inspections

HOA Board Role

Weekly progress meetings, change order approvals

5

Closeout

2-4 weeks

Activities

  • Punch list completion
  • Final inspections
  • System training
  • Warranty documentation
  • Reserve study update

HOA Board Role

Final walkthrough, payment approval, warranty receipt

Project Funding Options

Understanding your options for financing common area improvements.

Reserve Funds

Accumulated reserves designated for capital improvements

Advantages
  • + No interest costs
  • + Already planned for
  • + No unit owner approval needed
Considerations
  • - May deplete reserves
  • - Limited to available balance
  • - Impacts other projects
Best For

Planned improvements within reserve study scope

Special Assessment

One-time charge to unit owners for specific project

Advantages
  • + Funds large projects
  • + Spreads cost across owners
  • + Preserves reserves
Considerations
  • - Requires owner approval
  • - Payment collection challenges
  • - Owner resistance
Best For

Major improvements not fully funded by reserves

Association Loan

Bank financing repaid through assessments over time

Advantages
  • + Immediate funding
  • + Spreads payments over years
  • + Preserves reserves
Considerations
  • - Interest costs
  • - Long-term obligation
  • - Requires board approval
Best For

Large projects with steady assessment capacity

Phased Construction

Breaking project into stages funded over time

Advantages
  • + Smaller funding needs
  • + Can adjust based on results
  • + Maintains cash flow
Considerations
  • - Extended timeline
  • - Potential cost increases
  • - Ongoing disruption
Best For

Budget-constrained associations with multiple needs

Florida SB4-D Compliance Considerations

How Florida's condo safety legislation affects common area construction planning.

Milestone Inspections

Buildings 3+ stories must complete structural inspections at 30 years (25 if within 3 miles of coast), then every 10 years

Impact on Common Area Projects

Common area work may trigger inspection requirements; coordinate with SIRS compliance

SIRS Compliance

Structural Integrity Reserve Studies required for buildings 3+ stories

Impact on Common Area Projects

Reserve funding for structural components must be maintained; cannot waive reserves

Balcony/Walkway Assessment

Load-bearing elements of balconies and walkways must be inspected

Impact on Common Area Projects

Common area walkway and corridor work should address any structural deficiencies

Reserve Funding

Full funding of reserves for structural components now required

Impact on Common Area Projects

Budget for common area improvements must account for required reserve contributions

Our Common Area Services

Lobby Renovation

Complete lobby transformations including reception, mail rooms, and elevator lobbies.

Pool & Deck

Pool renovations, deck resurfacing, cabanas, and outdoor living spaces.

Fitness Centers

Complete fitness facility buildouts with proper ventilation and equipment infrastructure.

Parking & Garage

Parking structure repairs, waterproofing, lighting, and EV charging installation.

Frequently Asked Questions

Planning a Common Area Improvement?

FCS partners with HOA boards and property managers throughout Tampa Bay to deliver successful common area construction projects. From planning through completion, we guide your association every step of the way.