SB4-D Deadlines Are Here — Many Buildings Must Comply by December 31, 2024
CONDO COMPLIANCE GUIDE

Florida SB4-D Compliance Guide: What Every Condo Association Must Know

The Florida Building Safety Act (SB4-D) mandates milestone inspections and structural reserve studies for condominiums. Non-compliance exposes boards to liability. This guide explains every requirement Tampa Bay associations must meet.

What is Florida SB4-D?

Senate Bill 4-D (SB4-D), also known as the Florida Building Safety Act, was passed in May 2022 in response to the Champlain Towers South collapse in Surfside. It establishes mandatory structural inspection and reserve funding requirements for condominium and cooperative buildings.

Key Requirements:

  • Milestone Inspections: Structural inspections for buildings 30+ years old (25+ within 3 miles of coast)
  • SIRS Requirements: Structural Integrity Reserve Studies to plan and fund repairs
  • No Reserve Waivers: Associations can no longer vote to waive structural reserves
  • Disclosure Requirements: Inspection reports must be disclosed during unit sales

SB4-D Compliance Deadlines

Phase 1 Milestone Inspection (Coastal 30+ years)

Buildings within 3 miles of coast, 3+ stories, 30+ years old

December 31, 2024

Phase 1 Milestone Inspection (Inland 30+ years)

Buildings more than 3 miles from coast, 3+ stories, 30+ years old

December 31, 2025

SIRS (Structural Integrity Reserve Study)

All condos with 3+ stories must complete initial SIRS

December 31, 2024

Reserve Funding Must Begin

No more waiving reserves for structural components

January 1, 2025

Buildings 25-30 Years Old

Must complete milestone inspection by 30th anniversary

When building turns 30

Milestone Inspection Process

1
Phase 1

Visual Inspection

Licensed engineer or architect conducts visual examination of structural components

Deliverable: Written report identifying signs of substantial structural deterioration
Timeline: Typically 2-4 weeks
Outcome: If no issues found, building passes. If issues found, Phase 2 required.
2
Phase 2

In-Depth Assessment

Comprehensive inspection including testing if structural concerns identified in Phase 1

Deliverable: Detailed report with specific findings, recommendations, and remediation timeline
Timeline: 180 days from Phase 1 completion
Outcome: Must complete recommended repairs within specified timeframe

SIRS: What's Included in the Reserve Study?

The Structural Integrity Reserve Study must assess the following building components and determine funding requirements for their maintenance and replacement:

Structural Elements

  • Roof
  • Load-bearing walls
  • Foundation
  • Floor structures
  • Columns
  • Beams

Building Envelope

  • Fireproofing
  • Plumbing
  • Electrical systems
  • Waterproofing
  • Exterior painting
  • Windows

Common Areas

  • Balconies
  • Walkways
  • Parking structures
  • Elevators
  • Pool/recreational facilities

How FCS Helps with SB4-D Compliance

Florida Construction Specialists partners with condo associations throughout Tampa Bay to navigate SB4-D compliance and complete required remediation work.

Coordination with licensed structural engineers for inspections
Review and interpretation of inspection reports
Remediation planning and budgeting
Prioritized repair scheduling to minimize resident disruption
Quality construction of all structural repairs
Documentation for association records and insurance
Ongoing maintenance planning post-remediation

Request a Compliance Assessment

Don't wait for deadlines to approach. Contact FCS for a comprehensive SB4-D compliance assessment for your condominium association.

Frequently Asked Questions

SB4-D Compliance Deadlines Are Here

Don't risk non-compliance. FCS helps Tampa Bay condo associations meet SB4-D requirements and complete necessary structural repairs.