Multi-Family Construction Project Management

Expert coordination of complex apartment, condo, and mixed-use developments in Tampa Bay. From pre-construction through turnover, we deliver projects on time and on budget.

Multi-Family Project Types

Each project type presents unique management challenges requiring specialized expertise.

Project TypeUnitsStoriesPM Focus AreasTimeline
Garden-Style Apartments

Wood frame, Type V

50-300 units2-3 storiesSite logistics, phased occupancy, amenity coordination12-18 months
Mid-Rise Apartments

Wood over podium or steel frame, Type III

100-400 units4-6 storiesPodium coordination, vertical transportation, fire system complexity18-24 months
High-Rise Condos

Concrete or steel, Type I

100-500 units7+ storiesTower crane logistics, concrete cycle times, façade coordination24-36 months
Mixed-Use Development

Hybrid systems common

VariesVariableRetail/residential interface, parking structure, multiple occupancies18-30 months

Multi-Family Project Phases

Structured approach to delivering complex multi-unit residential projects.

1

Pre-Construction Planning

2-4 months

Key Activities

  • Site due diligence and feasibility analysis
  • Entitlement and zoning confirmation
  • Design development coordination
  • Value engineering sessions
  • Contractor prequalification and bidding
  • Financing coordination and draw schedule setup

Deliverables

GMP/lump sum proposal, master schedule, project budget

2

Permitting & Procurement

3-6 months

Key Activities

  • Building permit submissions and expediting
  • Long-lead material procurement
  • Subcontractor contract execution
  • Shop drawing review and approval
  • Utility coordination and agreements
  • Site logistics planning

Deliverables

Building permits, subcontracts, procurement log, site plan

3

Site Work & Foundation

2-4 months

Key Activities

  • Erosion control and SWPPP implementation
  • Mass grading and earthwork
  • Underground utilities installation
  • Foundation excavation and forming
  • Concrete placement and curing
  • Waterproofing and backfill

Deliverables

Foundation inspection sign-offs, as-built drawings

4

Vertical Construction

8-18 months

Key Activities

  • Structural framing (wood, steel, or concrete)
  • MEP rough-in coordination
  • Exterior envelope and waterproofing
  • Interior framing and drywall
  • Unit finishes and fixtures
  • Common area construction

Deliverables

Progress reports, inspection logs, quality documentation

5

Closeout & Turnover

2-3 months

Key Activities

  • Punch list completion
  • Final inspections and CO
  • System commissioning and testing
  • Owner training on building systems
  • Warranty documentation handover
  • Phased unit turnover coordination

Deliverables

Certificate of Occupancy, O&M manuals, warranty package

Critical Success Factors

Key areas that determine project success in multi-family construction.

Scheduling & Sequencing

Multi-family projects require precise coordination of repetitive work across hundreds of units

Best Practices

  • Use CPM scheduling with milestone payments tied to completion
  • Implement flow scheduling for repetitive unit work
  • Buffer critical path activities for weather and labor issues
  • Coordinate inspections in batches to minimize delays

Budget Management

Cost control across extended timelines with multiple stakeholders

Best Practices

  • Establish detailed cost codes matching unit types
  • Track costs at building/phase level for variance analysis
  • Implement change order protocols with owner approval thresholds
  • Forecast cash flow monthly with 90-day look-ahead

Quality Control

Consistent quality across identical units built by different crews

Best Practices

  • Create model units for finish and quality standards
  • Implement unit-by-unit inspection checklists
  • Track punch list metrics by trade contractor
  • Conduct third-party quality audits quarterly

Stakeholder Coordination

Managing owner, lender, design team, and regulatory relationships

Best Practices

  • Weekly OAC (Owner-Architect-Contractor) meetings
  • Monthly lender site walks and draw documentation
  • Regular design team coordination for RFIs
  • Proactive inspector relationship management

Common Challenges & Solutions

Proactive risk management for typical multi-family construction issues.

Labor Shortages

Impact

Schedule delays, quality issues, cost increases

Mitigation

Pre-qualify multiple subcontractors per trade, build long-term relationships, consider prefabrication to reduce site labor needs

Material Lead Times

Impact

Work stoppages, resequencing, expediting costs

Mitigation

Early procurement of long-lead items (switchgear, elevators, HVAC units), maintain buffer stock of critical materials

Weather Delays

Impact

Foundation and exterior work disruption

Mitigation

Build weather days into schedule, prioritize weather-sensitive activities, protect in-progress work

Design Changes

Impact

Rework, material waste, schedule impacts

Mitigation

Complete design before construction, implement formal change order process, track cumulative change impact

Inspection Coordination

Impact

Crews waiting, out-of-sequence work

Mitigation

Batch inspections by building/floor, pre-inspection walk-throughs, develop inspector relationships

Unit Turnover Sequence

Impact

Revenue delay, punch list bottleneck

Mitigation

Plan turnover sequence early, dedicate punch list crews, implement unit acceptance protocol

Our Project Management Services

Scheduling

CPM scheduling, resource loading, and progress tracking for complex multi-phase projects.

Cost Control

Budget development, change management, and financial reporting for owners and lenders.

Quality Assurance

Unit-by-unit inspection programs, model units, and third-party quality audits.

Coordination

Owner, architect, contractor, and lender coordination throughout project lifecycle.

Frequently Asked Questions

Planning a Multi-Family Development?

FCS provides comprehensive project management for apartment complexes, condominiums, and mixed-use developments throughout Tampa Bay. Let us bring your vision to reality on time and on budget.