Construction services in Tampa Bay
Back to Historic Home Renovation

Certificate of Appropriateness Guide

Navigate Tampa's historic review process with confidence. Expert guidance on COA applications, ARC hearings, and approval strategies for your historic property renovation.

Types of COA Review

Different levels of review based on scope and impact of proposed work.

Administrative Review (Staff Level)

1-2 weeks

Minor work, routine maintenance, in-kind repairs

Examples: Paint in approved colors, window repairs, roof replacement in-kind

Approved by: Historic Preservation staff

Tip: Most common for maintenance work; requires photos and specifications

Architectural Review Commission (ARC)

4-8 weeks

Significant alterations, additions, new construction

Examples: Additions, new windows, exterior alterations, demolition

Approved by: ARC board (monthly meetings)

Tip: Requires detailed plans; present in person for best results

Economic Hardship Review

8-12 weeks

When compliance creates unreasonable financial burden

Examples: Request for alternative materials, reduced requirements

Approved by: ARC after financial documentation

Tip: Rarely granted; requires extensive documentation

Demolition Review

3-6 months minimum

Full or partial demolition of contributing structures

Examples: Building demolition, removing significant features

Approved by: ARC + City Council in some cases

Tip: Most scrutinized; often requires mitigation measures

Tampa Historic Districts

Each district has unique characteristics and review requirements.

DistrictEstablishedPeriodArchitectural StylesStrictness
Hyde Park Historic District

Tampa's largest residential historic district

19851880s-1930sQueen Anne, Craftsman, Colonial Revival, Mediterranean RevivalHigh
Tampa Heights Historic District

Working-class historic neighborhood

20071890s-1940sVernacular, Craftsman, Frame VernacularModerate
Ybor City Historic District

Commercial and residential; strict signage requirements

1974 (National)1880s-1920sMediterranean, Commercial, Casitas, Cigar factoriesVery High
Seminole Heights Historic District

Several smaller districts with varying guidelines

2000s (multiple districts)1910s-1940sCraftsman Bungalow, Mediterranean, Minimal TraditionalModerate
West Tampa Historic District

Mix of residential and commercial; cigar industry heritage

20031890s-1930sVernacular, Craftsman, Shotgun, CommercialModerate

Application Requirements

Complete applications lead to faster approvals.

1

Application Form

City of Tampa COA application with project details

Tip: Complete all sections; incomplete applications delay review

2

Property Photos

Current photos of all affected areas and overall property

Tip: Include context shots showing relationship to neighbors

3

Site Plan

Showing property boundaries, existing structures, proposed work

Tip: For additions, show setbacks and relationship to main structure

4

Architectural Drawings

Plans, elevations, and details for proposed work

Tip: Scale drawings; show existing vs. proposed conditions

5

Material Specifications

Detailed specs for all proposed materials

Tip: Include manufacturer cut sheets, samples if possible

6

Historic Documentation

Research on original construction if requesting changes

Tip: Sanborn maps, historic photos help justify restoration

7

Contractor Information

Licensed contractor with historic preservation experience

Tip: Experience matters; provide relevant project list

Common COA Mistakes to Avoid

Learn from others' errors to ensure smooth approval.

Starting Work Without COA

Consequence: Stop work order, fines, required removal of work

Prevention: Always verify COA requirement before any exterior work

Using Inappropriate Materials

Consequence: Denial, required removal, replacement costs

Prevention: Specify exact materials; get pre-approval on substitutes

Incomplete Applications

Consequence: Delays, multiple resubmissions, missed meetings

Prevention: Use checklist; consult staff before submission

Ignoring Design Guidelines

Consequence: Denial, extensive redesign required

Prevention: Read district guidelines before designing

Changing Plans After Approval

Consequence: Additional review, potential revocation

Prevention: Get amendments approved before implementation

Demolition by Neglect

Consequence: Code enforcement, required restoration, fines

Prevention: Maintain property; document existing conditions

Strategies for COA Approval

Proven approaches for successful historic review applications.

Pre-Application Conference

Get feedback before investing in full plans

How: Request informal meeting with historic preservation staff

When: Early in planning phase, before hiring architect

Research District Guidelines

Design compliant projects from the start

How: Obtain and study specific guidelines for your district

When: Before any design work begins

Document Existing Conditions

Justify repairs vs. replacement; support change requests

How: Detailed photos, structural reports, material analysis

When: During initial property evaluation

Attend ARC Meetings

Understand review process and commissioner concerns

How: Observe meetings before your application

When: Month before your anticipated submission

Present In Person

Answer questions, demonstrate expertise and commitment

How: Prepare presentation; bring samples if helpful

When: At ARC hearing for significant projects

Use Qualified Professionals

Better applications, stronger credibility

How: Hire architect and contractor with historic experience

When: From project inception

Frequently Asked Questions

Need Help with Your COA Application?

FCS has guided hundreds of homeowners through Tampa's historic review process. From application preparation to ARC presentations, we help you get approval for your historic renovation project.